9. INSPECTION
The C=0 Sampling Plan is used to determine the number of parts that are dimensionally inspected. The sample size is based on the number of parts and the historical level of confidence regarding the part acceptability. Generally, the parts are presented to Inspection in sheet form. Parts are checked in the four corners and in a zig zag pattern throughout the sheet. If one part is rejected, the parts surrounding the scrapped part are checked until we are confident that there are no more out of tolerance parts in the sheet. When parts are given to Inspection as pieces, a sample size is determined using the C=0 Sampling Plan. If one part is rejected, the entire lot is checked. Breaking the parts out of the sheet and packaging for shipment is a critical role of the Inspector. This presents an opportunity to visually inspect the parts and assess cosmetics.
Sampling Plan
FIRST ARTICLE INSPECTION
CERTIFICATION PROVIDE BY NW ETCH
- Certificate of Conformance (NW Etch Packing List)
- Specialized Certifications as required by customer
- Metal Certification
SERVICES CERTIFICATES
- Forming, Plating, etc.
- All products are evaluated before and after services work.
- Records are maintained as required by ISO guidelines.
INSPECTION AND TEST EQUIPMENT
- Calipers
- Micrometers
- Depth gage
- Pin gages
- Surface plates
- Surface profilometer
- Optical Gauge Product Machine
Calibration is maintained on all inspection tools. Training records are maintained on all staff. Inspection stamps are issued after initial training is completed and documented. The inspection stamp number is based on the employee number and is therefore, unique. When an employee leaves the company, the stamp is pulled and the number retired.